Volans — Haziran 2026 · Kisi Bazli Detayli Performans Analizi

Sprint: 2026-05-30 — 2026-06-26  ·  7 Developer, 0 QA
Kaynak: Jira (OPT board) · uretim 2026-07-30 · 247 task tarandi

Executive Summary

118%
Takim Success
100%
Takim Due Date Acc
583 efor
Toplam Target
688 efor
Toplam Realization
7 / 0
Dev / QA
0 / 0
Escape (QR / UAT)

Mayis → Bu Ay — Kisi Bazli Success Degisimi

KisiRolMayisBu AyDegisim (pp)
Uğurcan IşıkDev154.9%157%▲ 2.1
Kerem CanlıDev123.8%113.9%▼ 9.9
Bekir GörkemDev115.1%113.7%▼ 1.4
Muhammet İçgilDev96.5%110.8%▲ 14.3
Mehmet GezginDev114.8%105.9%▼ 8.9
Atakan ErtürkDev104.4%100%▼ 4.4
Soner SayınDev117.8%

Karsilastirma Grafikleri

Success Rate (%) — Tum Ekip

Due Date Accuracy (%)

Fix Dagilimi (CR / QA / QR / UAT)

Task Sayisi & Effort Average

Kisi Bazli Detayli Analiz — Developers

Soner SayınDeveloper
12
Board Task
Target
16
Realize
Success
100%
Due Date Acc
0 / 1
CR / QA Fix
Success: sheet'te efor target'i bulunamadi (isim eslesmesi/bos hucre olabilir) — success hesaplanamadi. Teslim edilen: 16 efor.
Kod Kalitesi: temiz — 0 CR + 1 QA fix / 12 task (task basi 0.08).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 1 meeting, 6 web service task ustlendi — ekstra katki/yuk (pozitif).
Gecen Aya Gore: efor ▼80 (96→16); fix ▼26 (27→1).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: temiz kod, 7 ek-sorumluluk.
Board task detayi (12)
TaskTakimEforCR/QA FixDurum
OPT-233669Scorpius30/0Done
OPT-231960Volans20/0Done
OPT-231958Volans20/0Done
OPT-231957Volans20/0Done
OPT-231952Volans20/1Done
OPT-231859Volans20/0Done
OPT-230939Volans20/0Blocked (CSM)
VLS-766510/0Done
VLS-763110/0Done
VLS-759510/0Done
VLS-752010/0Done
OPT-233937Volans10/0Done
Uğurcan IşıkDeveloper
69
Board Task
114
Target
179
Realize
157%
Success
100%
Due Date Acc
5 / 0
CR / QA Fix
Success: %157 — hedefin belirgin uzerinde (179/114 efor, plani 65 efor asti).
Kod Kalitesi: temiz — 5 CR + 0 QA fix / 69 task (task basi 0.07).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 3 urgent, 29 web service task ustlendi — ekstra katki/yuk (pozitif).
Excluded: 2 task rejected — metriklere dahil degil.
Gecen Aya Gore: success ▲2.1% (154.9→157%); efor ▲21 (158→179); fix ▼4 (9→5).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod, 32 ek-sorumluluk.
Board task detayi (71)
TaskTakimEforCR/QA FixDurum
VLS-7768Volans201/0Done
VLS-7663Volans201/0Done
VLS-7732170/0Rejected
OPT-233864Volans130/0Done
OPT-233286Volans80/0Done
VLS-749850/0Done
VLS-749750/0Done
OPT-234965Volans50/0Done
OPT-233203Volans50/0Done
OPT-233202Volans50/0Done
OPT-233029Volans50/0Done
VLS-761730/0Done
VLS-755430/0Done
VLS-753130/0Done
VLS-749630/0Done
VLS-749030/0Done
OPT-234282Volans30/0Done
OPT-234068Volans30/0Done
OPT-233320Volans30/0Done
OPT-232979Volans30/0Done
OPT-232707Scorpius30/0Done
OPT-232460Volans30/0Done
OPT-231471Volans30/0Done
OPT-231468Volans30/0Done
VLS-770520/0Done
VLS-769220/0Done
VLS-767620/0Done
VLS-761320/0Done
VLS-759120/0Done
VLS-758920/0Done
VLS-748820/0Done
OPT-234434Volans21/0Done
OPT-234087Volans20/0Done
OPT-233988Volans20/0Done
OPT-233125Volans20/0Done
OPT-232913Volans20/0Done
OPT-232659Volans20/0Done
OPT-231963Volans20/0Done
OPT-231956Volans20/0Done
OPT-231463Volans21/0Done
OPT-231462Volans20/0Done
OPT-230244Volans20/0Done
OPT-230015Volans20/0Done
VLS-774610/0Done
VLS-774010/0Done
VLS-773110/0Done
VLS-772110/0Done
VLS-771510/0Rejected
VLS-771410/0Done
VLS-770710/0Done
VLS-769110/0Done
VLS-768610/0Done
VLS-763010/0Done
VLS-762910/0Done
VLS-761910/0Done
VLS-761810/0Done
VLS-760310/0Done
VLS-759910/0Done
VLS-759810/0Done
VLS-757910/0Done
VLS-757810/0Done
VLS-757710/0Done
VLS-753710/0Done
VLS-752910/0Done
VLS-751610/0Done
VLS-750610/0Done
OPT-234583Volans10/0Done
OPT-233340Volans10/0Done
OPT-233229Volans10/0Done
OPT-233124Volans10/0Done
OPT-225865Volans01/0Done
Kerem CanlıDeveloper
25
Board Task
82.5
Target
94
Realize
113.9%
Success
100%
Due Date Acc
0 / 1
CR / QA Fix
Success: %113.9 — hedefin belirgin uzerinde (94/82.5 efor, plani 11.5 efor asti).
Kod Kalitesi: temiz — 0 CR + 1 QA fix / 25 task (task basi 0.04).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 2 urgent, 1 web service task ustlendi — ekstra katki/yuk (pozitif).
Excluded: 1 task rejected — metriklere dahil degil.
Gecen Aya Gore: success ▼9.9% (123.8→113.9%); efor ▲16 (78→94); fix ▲1 (0→1).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod, 3 ek-sorumluluk.
Board task detayi (26)
TaskTakimEforCR/QA FixDurum
VLS-6001Volans270/0Done
VLS-7574Volans210/0Done
VLS-7628Volans170/0Done
VLS-508150/0Done
OPT-234108Volans50/0Rejected
OPT-235615Volans30/1Done
VLS-775520/0Done
VLS-773420/0Done
VLS-7678Volans20/0Done
VLS-760420/0Done
VLS-777410/0Done
VLS-776910/0Done
VLS-776610/0Done
VLS-775810/0Done
VLS-775210/0Done
VLS-774310/0Done
VLS-773910/0Done
VLS-767910/0Done
VLS-767710/0Done
VLS-766210/0Done
VLS-765010/0Done
VLS-764910/0Done
VLS-764510/0Done
VLS-764310/0Done
VLS-764210/0Done
VLS-761510/0Done
Bekir GörkemDeveloper
31
Board Task
102
Target
116
Realize
113.7%
Success
100%
Due Date Acc
1 / 5
CR / QA Fix
Success: %113.7 — hedefin belirgin uzerinde (116/102 efor, plani 14 efor asti).
Kod Kalitesi: temiz — 1 CR + 5 QA fix / 31 task (task basi 0.19).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 3 urgent, 8 web service task ustlendi — ekstra katki/yuk (pozitif).
Excluded: 1 task rejected — metriklere dahil degil.
Gecen Aya Gore: success ▼1.4% (115.1→113.7%); efor ▲5.5 (110.5→116); fix ▼1 (7→6).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod, 11 ek-sorumluluk.
Board task detayi (32)
TaskTakimEforCR/QA FixDurum
OPT-232997Volans170/1Done
VLS-8053Volans13.50/0Done
VLS-7680130/0Done
OPT-232958Volans130/2Done
VLS-766480/0Done
VLS-757280/0Done
OPT-234244Volans80/0Done
VLS-775050/0Done
VLS-752450/0Done
VLS-748450/0Done
VLS-79384.50/0Done
VLS-7816Volans40/0Done
VLS-772430/0Done
VLS-772330/0Rejected
OPT-234264Volans30/0Done
OPT-228531Volans31/2Done
VLS-773320/0Done
VLS-769920/0Done
VLS-765720/0Done
OPT-232061Volans20/0Done
OPT-230583Volans20/0Done
VLS-778110/0Done
VLS-772910/0Done
VLS-771810/0Done
VLS-769810/0Done
VLS-759610/0Done
VLS-759010/0Done
VLS-758410/0Done
VLS-751310/0Done
VLS-748010/0Done
OPT-234850Volans10/0Done
OPT-233953Volans10/0Done
Muhammet İçgilDeveloper
30
Board Task
83
Target
92
Realize
110.8%
Success
100%
Due Date Acc
1 / 4
CR / QA Fix
Success: %110.8 — hedefin belirgin uzerinde (92/83 efor, plani 9 efor asti).
Kod Kalitesi: temiz — 1 CR + 4 QA fix / 30 task (task basi 0.17).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 5 urgent, 11 web service task ustlendi — ekstra katki/yuk (pozitif).
Gecen Aya Gore: success ▲14.3% (96.5→110.8%); efor ▼33.5 (125.5→92); fix ▲4 (1→5).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod, 16 ek-sorumluluk, gecen aya gore yukselis.
Board task detayi (30)
TaskTakimEforCR/QA FixDurum
VLS-7607Volans80/0Done
OPT-233909Volans80/0Done
OPT-233336Volans81/0Done
OPT-231182Volans80/3Done
VLS-767350/0Done
VLS-751850/0Done
OPT-231186Volans50/0Done
VLS-766030/0Done
VLS-764830/0Done
VLS-763730/0Done
VLS-759730/0Done
VLS-752730/0Done
OPT-233977Volans30/0Done
OPT-233615Volans30/0Done
OPT-232774Volans30/1Done
OPT-232180Volans30/0Done
VLS-770120/0Done
VLS-760920/0Done
VLS-750120/0Done
OPT-235951Volans20/0Effort Estimation
OPT-233789Volans20/0Done
OPT-232816Volans20/0Done
OPT-231181Volans20/0Done
VLS-768210/0Done
VLS-767410/0Done
VLS-767210/0Done
VLS-758310/0Done
VLS-752310/0Done
VLS-751910/0Done
OPT-233461Volans00/0Done
Mehmet GezginDeveloper
20
Board Task
93.5
Target
99
Realize
105.9%
Success
100%
Due Date Acc
0 / 0
CR / QA Fix
Success: %105.9 — hedefi tutturdu (99/93.5 efor).
Kod Kalitesi: sifir fix — 20 task ilk seferde gecti.
Termin: tum task'lar due date'inde teslim.
Gecen Aya Gore: success ▼8.9% (114.8→105.9%); efor ▼2 (101→99); fix ▼1 (1→0).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod.
Board task detayi (20)
TaskTakimEforCR/QA FixDurum
VLS-7741170/0Done
VLS-7635130/0Done
VLS-7586130/0Done
VLS-7509130/0Done
VLS-777380/0Done
VLS-769780/0Done
VLS-7669Volans80/0Done
VLS-758180/0Done
VLS-771950/0Done
OPT-230403Volans50/0Done
VLS-770630/0Done
VLS-764430/0Done
VLS-758030/0Done
VLS-750220/0Done
VLS-772810/0Done
VLS-772610/0Done
VLS-772210/0Done
VLS-771610/0Done
VLS-768410/0Done
VLS-767110/0Done
Atakan ErtürkDeveloper
44
Board Task
108
Target
108
Realize
100%
Success
100%
Due Date Acc
2 / 0
CR / QA Fix
Success: %100 — hedefi tutturdu (108/108 efor).
Kod Kalitesi: temiz — 2 CR + 0 QA fix / 44 task (task basi 0.05).
Termin: tum task'lar due date'inde teslim.
Ek Sorumluluk: 1 urgent, 12 web service task ustlendi — ekstra katki/yuk (pozitif).
Excluded: 1 task rejected — metriklere dahil degil.
Gecen Aya Gore: success ▼4.4% (104.4→100%); efor ▲14 (94→108); fix ▼3 (5→2).
Gelistirilmesi Onerilen: bu ay belirgin bir gelisim alani yok — tum KPI'lar hedefte. Mevcut tempo korunmali.
Genel Degerlendirme: Guclu yonler: hedef ustu teslim, temiz kod, 13 ek-sorumluluk.
Board task detayi (45)
TaskTakimEforCR/QA FixDurum
VLS-7575170/0Done
VLS-7683130/0Done
OPT-229892Volans81/0Done
VLS-770850/0Done
VLS-753250/0Done
VLS-753330/0Done
VLS-753030/0Done
OPT-234267Volans30/0Done
OPT-234100Volans31/0Done
VLS-774820/0Done
VLS-762720/0Done
VLS-753620/0Done
VLS-752220/0Done
VLS-751120/0Done
OPT-234874Volans20/0Done
OPT-231455Volans20/0Done
OPT-231135Volans20/0Done
OPT-231133Volans20/0Done
OPT-231127Volans20/0Done
OPT-231124Volans20/0Done
OPT-231123Volans20/0Done
OPT-231016Volans20/0Done
VLS-776710/0Done
VLS-775710/0Done
VLS-773510/0Done
VLS-772710/0Done
VLS-772510/0Done
VLS-772010/0Done
VLS-771710/0Done
VLS-769610/0Done
VLS-769310/0Done
VLS-769010/0Done
VLS-768110/0Done
VLS-766110/0Done
VLS-765510/0Done
VLS-764610/0Done
VLS-764010/0Done
VLS-761110/0Done
VLS-761010/0Done
VLS-760010/0Done
VLS-754210/0Rejected
VLS-752810/0Done
VLS-752510/0Done
VLS-751210/0Done
OPT-233974Volans10/0Done

Kisi Bazli Detayli Analiz — Quality Assurance

Fix Analizi — Code Quality & Test Kalitesi

KisiRolCR FixQA FixQR FixUAT FixFix/Task
Soner SayınDev018.3%
Uğurcan IşıkDev507.2%
Kerem CanlıDev014%
Bekir GörkemDev1519.4%
Muhammet İçgilDev1416.7%
Mehmet GezginDev000%
Atakan ErtürkDev204.5%

Genel Siralama — Tum Ekip (Dev: Board Success · QA: QA Success)

#KisiRolSuccessDue AccFix/TaskDegerlendirme
1Uğurcan IşıkDev157%100%7%Mukemmel
2Kerem CanlıDev113.9%100%4%Mukemmel
3Bekir GörkemDev113.7%100%19%Mukemmel
4Muhammet İçgilDev110.8%100%17%Mukemmel
5Mehmet GezginDev105.9%100%0%Mukemmel
6Atakan ErtürkDev100%100%5%Mukemmel
7Soner SayınDev100%8%Gelisime Acik

Key Takeaways & Aksiyon Onerileri

Hedefi tutturanlar (6): Uğurcan Işık, Kerem Canlı, Bekir Görkem, Muhammet İçgil, Mehmet Gezgin, Atakan Ertürk.
Hicbir QA'da QR fix yok — test kalitesi yuksek.
En temiz kod: Mehmet Gezgin — en dusuk fix orani.
Takim board success %118, due date accuracy %100.
Takim Success = toplam realization / toplam target (rejected task'lar HARIC). Efor Basi Saat = InProg suresi / SP. Saat = InProg status suresi (wall-clock, net mesai degil). Fix count'lari Insight ile birebir tutar. Rol: Developer alani (cf_13202)→Dev, QA Tester (cf_13401)→QA. Jira-native — Insight klonu degil.